Roads and Bridges - メーカー・企業と製品の一覧 | イプロス

Roads and Bridgesの製品一覧

1~1 件を表示 / 全 1 件

表示件数

Rack scaffolding construction achievements: Sanpo Irro Bridge

Thank you for using it for the cutting and bolt removal at the base of the wall railing and the cantilevered steel deck!

We would like to introduce our construction achievements related to the removal work of the Sanpo Entrance (Bay P121 to Sanpo Entrance P2) bridge. The bridge is a three-span continuous steel deck box girder bridge. To avoid impacting the work, we adopted a method where the running rails of the "rack scaffolding" were installed on the protruding part of the lower flange of the box girder, utilizing the cutting and bolt removal of the wall parapet and the root of the steel deck overhang. After the work was completed, we were able to quickly relocate the scaffolding, allowing for prompt temporary support of the main girder using a bent. 【Overview】 ■ Location/Prefecture: Osaka Prefecture ■ Client: Hanshin Expressway Company Limited ■ Construction Company: Yokogawa, Yokogawa Sumitomo, Takigami Construction Joint Venture ■ Start Date of Use: June 2011 ■ Local Workers' Experience with Rack Scaffolding: First time ■ Dispatch of Rack Scaffolding Handling Instructors: Yes *For more details, please refer to the PDF document or feel free to contact us.

  • image_01.png
  • Scaffolding and Support Materials
  • Roads and Bridges

ブックマークに追加いたしました

ブックマーク一覧

ブックマークを削除いたしました

ブックマーク一覧

これ以上ブックマークできません

会員登録すると、ブックマークできる件数が増えて、ラベルをつけて整理することもできます

無料会員登録